[SML] Relays vs. Traditional Circuit Breakers for LED Power.
Rob Graham
photonguide at gmail.com
Sat Aug 13 13:06:04 UTC 2016
I'm not sure I agree with the engineer about replacing the wiring as well. I've suggested inspecting the wiring to determine if it needs replacement; they seem to make the assumption it needs it automatically.
Robert Graham
Photonguide at gmail.com
Sent from my mobile device. Please forgive spelling and grammatical errors that may be the result of an insane autocorrect choice, or my clumsy thumbs.
On Aug 13, 2016, 7:50 AM -0500, Bill Conner via Stagecraft <stagecraft at theatrical.net>, wrote:
>
> Well, I'm not sure I'd come to the same conclusion about replacing wiring or not renovating the D192s but if spending that much, the relays seem like a very small part of the work.
>
>
> If you do go the way on one bull switch, make sure it and the wiring is designed for the inrush of the whole rig powering at once. Just make sure your electrical engineer knows the inrush ratings of a full rig.
>
> ____________________________________________________________
> For list information see <http://stagecraft.theprices.net/>
> Stagecraft mailing list
> Stagecraft at theatrical.net
> http://theatrical.net/mailman/listinfo/stagecraft_theatrical.net
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://theatrical.net/pipermail/stagecraft_theatrical.net/attachments/20160813/88cd219e/attachment.html>
More information about the Stagecraft
mailing list