[SML] lay out methods
Richard Niederberg
ladesigners at gmail.com
Sun Aug 14 22:54:07 UTC 2016
To Samuel,
>From a spot along the centerline, below the low trims, so as to avoid the
creation of shadows, half way between the plasterline and the back wall.
Put surveyor's brass tacks near the corners, so you can re-calibrate
periodically. An inexpensive video projector adjusted for keystoning,
shooting into a first-surface mirror can be used to project the grid onto
the floor, if the projector's cooling system requires that the projector be
kept in a horizontal orientation.
/s/ Richard
On Sun, Aug 14, 2016 at 3:30 PM, SAMUEL JONES via Stagecraft <
stagecraft at theatrical.net> wrote:
> From where?
>
> Sam
>
> On Aug 14, 2016, at 3:22 PM, Richard Niederberg via Stagecraft <
> stagecraft at theatrical.net> wrote:
>
> Of course, you can project lines and intersections on the floor, corrected
> for keystoning, producing a grid just like x-ray machines and other devices
> using radiology do on a patient's body.
> /s/ Richard
>
>
>
> ____________________________________________________________
> For list information see <http://stagecraft.theprices.net/>
> Stagecraft mailing list
> Stagecraft at theatrical.net
> http://theatrical.net/mailman/listinfo/stagecraft_theatrical.net
>
--
/s/ Richard
_________
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://theatrical.net/pipermail/stagecraft_theatrical.net/attachments/20160814/f4a60ce2/attachment.html>
More information about the Stagecraft
mailing list