<div dir="ltr">THEY would seem to have the responsibility to have a set of engineer approved and stamped drawings created for the project. That would seem to cover them and your operation in the event of failure in the future. That engineer should define max load and mounting methodology for the gear. There will be cables to consider as well.<div>Good luck.</div><div>Steve</div></div><div class="gmail_extra"><br clear="all"><div><div class="gmail_signature"><div dir="ltr"><div><div>Stephen E. Rees</div><div dir="ltr">RAC Addition Project Shepherd<div>State University of New York at Fredonia</div><div>716.673.3208 Office</div><div>716.680.1565 Mobile</div><div><br></div></div></div></div></div></div>
<br><div class="gmail_quote">On Tue, Jan 12, 2016 at 1:05 PM, nathan best via Stagecraft <span dir="ltr"><<a href="mailto:stagecraft@theatrical.net" target="_blank">stagecraft@theatrical.net</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><p dir="ltr">Question: AV install company wants to mount a projector to our wire tension grid from the structural beams holding it up. Is this a thing? It's a 4x4 box tubing. They're clamping to it, not drilling into it.</p>
<br>____________________________________________________________<br>
For list information see <<a href="http://stagecraft.theprices.net/" rel="noreferrer" target="_blank">http://stagecraft.theprices.net/</a>><br>
Stagecraft mailing list<br>
<a href="mailto:Stagecraft@theatrical.net">Stagecraft@theatrical.net</a><br>
<a href="http://theatrical.net/mailman/listinfo/stagecraft_theatrical.net" rel="noreferrer" target="_blank">http://theatrical.net/mailman/listinfo/stagecraft_theatrical.net</a><br></blockquote></div><br></div>