<div>On Fri, Mar 30, 2018 at 3:55 PM Bill Sapsis via Stagecraft <<a href="mailto:stagecraft@theatrical.net">stagecraft@theatrical.net</a>> wrote:</div><div dir="auto"><br><div class="gmail_quote" dir="auto"><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">The second hole on the batten clamp is to suspended something from the batten clamp.<br>
One bolt above the batten and one bolt below.<br>
Shackle, bolt, rapid link...whatever...(as long as it has an appropriate load rating) goes in the bottom hole to hang the track.</blockquote><div dir="auto"><br></div><div dir="auto"><br></div><div dir="auto">Note also that you do not split the two halves of the track hanger with the tail of the barren clamp, nor do you split the two halves of the batten clamp with the tail of the track hanger; the two clamp assemblies should bolt side-by-side, not married.</div><div dir="auto"><br></div><div dir="auto">HTH, HAND, &c...</div></div></div>-- <br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature">Dave Vick<br>517-749-3859<br>Sent from my #%!^¥? iPhone</div>