[SML] Raked staging

Jerry Durand jdurand at interstellar.com
Thu Sep 10 18:48:38 UTC 2015


Take the director outside to look at roofs.  Our minimum roof here for
metal is 2" in 12", shingles are more like 4" in 12".  Offer to let him
walk on one of those.

On 09/10/2015 11:41 AM, Douglas G Marshall via Stagecraft wrote:
>
> If you have equity actors, you will need to consult with your SM or
> your  local AEA rep.  (they have requirements)(when not a full stage,
> not sure how it applies)
>
>  
>
> If you have a stock 4x8,  Just leg that up to different degrees for a
> sample.  How much movement has to happen in the 4x12 area?   What
> happens if you slip?
>
>  
>
> Can you safely walk at the angle?   Can an actor with Lights in their
> eyes and costumes on, do it safely every time?
>
>  
>
> Your Hell no seems very correct J.    No degree to offer as help
> though…..  Any full stage rake I have done has been to max AEA
> standards. (think 1” rise over 12”, but would have to look at the Rule
> book(s) for a refresher.)  
>
>  
>

-- 
Jerry Durand, Durand Interstellar, Inc.  www.interstellar.com
tel: +1 408 356-3886, USA toll free: 1 866 356-3886
Skype:  jerrydurand 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://theatrical.net/pipermail/stagecraft_theatrical.net/attachments/20150910/89c8bf5c/attachment.html>


More information about the Stagecraft mailing list