[SML] Stapling Lauan
Dan Sheehan
dsheehan.sml at gmail.com
Tue Dec 29 20:10:38 UTC 2015
1) predrill the lauan with 11/64 or 3/16...
screws pull down *much* easier & cleaner (this saves time),
doesn't have to scrunch up much material so doesn't raise a ridge around
the crater
can use fewer screws, and add brads in between screws
2) my fave trick for hiding screws and other holes / pits..
while priming, roll paint over the hole area,
stick a small piece of *torn* newspaper onto/into the wet paint,
roll or brush more paint over that.
quick & easy, no added drying cycle required
HTH
On Tue, Dec 29, 2015 at 2:57 PM, Randy Storms via Stagecraft <
stagecraft at theatrical.net> wrote:
> I need to build a number of Hollywood flats with 1/4" lauan faces - I have
> had difficulty in the past securing the skins in this situation - screws
> are too visible, and brads and staples pull right through. I end up
> stapling and gluing, then repairing them after every performance. Anyone
> have a secret trick?
>
> Randy Storms
> Mount Baker Theatre
> Bellingham, WA
>
> ____________________________________________________________
> For list information see <http://stagecraft.theprices.net/>
> Stagecraft mailing list
> Stagecraft at theatrical.net
> http://theatrical.net/mailman/listinfo/stagecraft_theatrical.net
>
--
...Dan Sheehan
Fixer of things that break
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://theatrical.net/pipermail/stagecraft_theatrical.net/attachments/20151229/b0630771/attachment.html>
More information about the Stagecraft
mailing list