[SML] Batten Clamps Question
Bill Sapsis
bill at sapsis-rigging.com
Fri Mar 30 19:55:35 UTC 2018
The second hole on the batten clamp is to suspended something from the batten clamp.
One bolt above the batten and one bolt below.
Shackle, bolt, rapid link...whatever...(as long as it has an appropriate load rating) goes in the bottom hole to hang the track.
Zat help?
Bill S
bill at sapsis-rigging.com
http://sapsis-rigging.com
+1.267.278.4561 mobile
On 3/30/18, 3:36 PM, "Stagecraft on behalf of Lon Butcher via Stagecraft" <stagecraft-bounces at theatrical.net on behalf of stagecraft at theatrical.net> wrote:
Hello to "The List",
For batten clamps that hold up traveler track. Is there a right and
wrong between using two bolts on the track side, or two bolts above
the batten?
Thanks,
Lon
--
Lon Butcher
"Tinkerer at large"
Portland, Maine
____________________________________________________________
For list information see <http://stagecraft.theprices.net/>
Stagecraft mailing list
Stagecraft at theatrical.net
http://theatrical.net/mailman/listinfo/stagecraft_theatrical.net
More information about the Stagecraft
mailing list