[SML] Batten Clamps Question
Lon Butcher
butcher.sml at gmail.com
Fri Mar 30 19:59:43 UTC 2018
Thanks Bill,
That's exactly what I was looking for!
Cheers,
Lon
On Fri, Mar 30, 2018 at 3:55 PM, Bill Sapsis via Stagecraft
<stagecraft at theatrical.net> wrote:
> The second hole on the batten clamp is to suspended something from the batten clamp.
> One bolt above the batten and one bolt below.
> Shackle, bolt, rapid link...whatever...(as long as it has an appropriate load rating) goes in the bottom hole to hang the track.
>
> Zat help?
>
> Bill S
>
> bill at sapsis-rigging.com
> http://sapsis-rigging.com
> +1.267.278.4561 mobile
> On 3/30/18, 3:36 PM, "Stagecraft on behalf of Lon Butcher via Stagecraft" <stagecraft-bounces at theatrical.net on behalf of stagecraft at theatrical.net> wrote:
>
> Hello to "The List",
>
> For batten clamps that hold up traveler track. Is there a right and
> wrong between using two bolts on the track side, or two bolts above
> the batten?
>
> Thanks,
> Lon
>
> --
> Lon Butcher
> "Tinkerer at large"
> Portland, Maine
>
> ____________________________________________________________
> For list information see <http://stagecraft.theprices.net/>
> Stagecraft mailing list
> Stagecraft at theatrical.net
> http://theatrical.net/mailman/listinfo/stagecraft_theatrical.net
>
>
> ____________________________________________________________
> For list information see <http://stagecraft.theprices.net/>
> Stagecraft mailing list
> Stagecraft at theatrical.net
> http://theatrical.net/mailman/listinfo/stagecraft_theatrical.net
--
Lon Butcher
"Tinkerer at large"
Portland, Maine
More information about the Stagecraft
mailing list